Showing posts with label STO. Show all posts
Showing posts with label STO. Show all posts

Thursday, February 2, 2012

In the Year 2012: Route extensions and changes on Rideau Street

OC Transpo released their 2012 Business Plan a week ago and in case you missed my previous posts on the plan, you can look at Presto Cards, Billboards for ads and bus arrival displays, and Park and Rides.  Today, we'll look at some ideas in the plan that calls for extending routes 94 and 99.

When the Strandherd-Armstrong bridge opens later this year, OC Transpo plans on extending route 94 to Riverview station and extending route 99 to the RCMP office in Barrhaven. Existing customers of either routes must be cringing.  The problem with route 94 is that it is such a long route and as soon as it operates with car traffic in the suburbs, it is no longer "rapid-transit" anymore.  There are more chances of the route being delayed when the route is far too long.  The route might better if it's broken in two like the old route 2 from Blair to Bayshore.

As for route 99 serving the RCMP offices.  Currently, there are two peak period routes (94, 199) and one regular route (176) serving the RCMP building on Leikin. I'm not sure how many RCMP staff members take transit, but, assuming service levels stay the same, four routes seems a bit much to serve a single company

There are plans to revise OC Transpo service to Gatineau: The OC Transpo bus routes extending into Gatineau will be revised to provide new connections with the STO’s Rapibus service, reducing
operating pressure on Rideau and Wellington Streets in downtown Ottawa.” This seems vague at this point in time. From what I understand, this may imply there will be fewer STO buses operating on Rideau and Wellington, which will be replaced by more OC Transpo service to STO's future Rapibus. For OC Transpo customers on a Rideau or Wellington bus, one would hope this means faster service in the bus lanes.

Tuesday, August 16, 2011

Complaints, complaints, complaints against OC Transpo and STO

It seems like over the last few weeks we've seen a spat of articles about complaints made against our local transit authorities, OC Transpo and STO. Rather than delve into them one by one, it seems sensible to discuss them here.

Most of us remember the STO operator who was filmed doing paperwork while driving along one of Gatineau's busiest streets a couple of weeks ago. It looked like he was disciplined, but not fired, for the transgression. His union is working on protecting driver privacy by ensuring riders can't film drivers, but the Ottawa Citizen's David Reevely argues that the freedom to record drivers breaking rules (especially when they endanger the lives of the riders they're carrying) can be a pretty useful thing.

Don't think there haven't been complaints about OC Transpo, though. The Ottawa Citizen reported a few weeks ago that riders made 178 complaints about drivers using electronic devices behind the wheel between the year-long period from April 1, 2010, to March 31, 2011. ATU 279 president Garry Queale questioned the number of legitimate complaints in that pool and transit commissioner Keith Egli downplayed the number of complaints, while a letter-writer to the Citizen wondered why people would make up complaints about such a specific violation.

Finally, one OC Transpo operator is facing allegations that he left his bus idling while he picked up some "groceries" from the LCBO.

And, of course, Twitter and other social media are always filled with complaints about OC Transpo.

The problem with complaining about public transit is that, sometimes, the delay you're experiencing isn't anything that could have been avoided. Take the massive delays yesterday along the Transitway between Hurdman and Laurier Station due to a collision between a bus and a pedestrian. I saw the grisly aftermath of that collision as I took the bus down the roadway, but even seeing that didn't stop people on my bus from complaining. And that's disrespectful to the person who is now in critical condition, to the driver who's likely dealing with a lot of trauma of his own as a result of it, and it's a shame.

Next time you're complaining about OC Transpo service, take a minute to consider the possibility that it's not necessarily managerial incompetence that's made you a few minutes late.

Tuesday, August 2, 2011

Multitasking behind the wheel

Unreal:


That's terrifying. The above video is of an STO driver filling out and filing paperwork while driving on what is reportedly one of Gatineau's busiest roads. With traffic obviously moving all around him. I don't even want to imagine being on that bus, or being a driver alongside him.

From a CBC article on the incident:
"Dominique Leclerc, speaking for Société de transport de l'Outaouais, said the driver's behaviour was unsafe and that the service would speak with him to get "his version."

"The bus driver's union wouldn't comment on the video, but a union official told CBC News the recording might violate the driver's privacy rights."
I'd be interested in hearing what kind of defence the driver might be able to come up with. I can't imagine a circumstance that would make that transgression acceptable.

While it's true that the video is likely a violation of the driver's privacy, you'd have to be kidding yourself to expect someone not to when you're doing something so ridiculous. Did you see the part where he stuck his arms through the wheel and onto the dash to grab some papers?

Like I said, unreal.

Monday, April 11, 2011

Could Ottawa use a commuter ferry?


Interprovincial transit is kind of a hot issue in the national capital region right now. Currently, OC Transpo drives across the river into Gatineau, and STO drives across the river into Ottawa. Neither are particularly popular on the other side, but the presence of STO buses in downtown Ottawa has been an especially unpopular reality for city planners here. Add to that the fact that the interprovincial service of OC Transpo removes it from provincial jurisdiction and into federal hands, thus decreasing the possibility of an essential-service designation that some have called for, and you see that Ottawa and Gatineau have a bit of a problem on their hands.

There are a few ways to prevent this bus cross-over--most popular being an LRT connection across the river--but one idea I thought would be interesting, and as far as I know hasn't yet been discussed, is a commuter ferry joining the two transit providers. The image above is a possible route, running about 500 metres (maybe a 10-15 minute ride) between the Hull Marina and an area near the Ottawa Rowing Club near Sussex Drive. If Ottawa and Gatineau were to initiate a ferry, this seems like as reasonable a route as any.

On the Gatineau side, the decision is easy. It would require negotiation with the Hull Marina, and perhaps some retrofitting of the facilities to ensure they could handle what would likely be a fairly large boat, but the marina is run by a not-for-profit management board which may be open to the possibility (although I haven't spoken with representatives to confirm this). The Ottawa side would be more of an issue, because a harbour would need to be built to dock the ferry and load passengers. The area I selected, near the rowing club around Sussex Drive, was recently discussed on OpenFile Ottawa, and development projects around there may be in the works. Those projects could include the construction of a harbour for these purposes.

Interestingly, the land between Lady Grey Drive and the river is owned by the National Capital Commission; if an Ottawa Port Authority were to be established, it would make sense for the NCC to be the catalyst for it.

The problem with the above image? Well, most obvious, is the fact that OC Transpo buses don't go anywhere near Lady Grey Drive; most buses will have followed the Transitway south towards the Hurdman Bridge as they head that far east. The other option would be west of downtown, near Lebreton Flats or in Nepean Bay, but that's a long haul for the ferry to run, and it would have to run along the front of the Chaudières Falls.

Maybe it's not something that can happen. Maybe it can. I just think it would be an interesting and potentially effective way of uniting two regional transit utilities with a novel transportation option.

Saturday, February 5, 2011

Delays in implementing SmartCard system

Delays in implementing a SmartCard fare system have made it unlikely that the system will be ready before 2012, according to a report on 580 CFRA. The City had hoped to have Presto available "by 2011", but... apparently, that timeline was too ambitious.

From 580 CFRA:

OC Transpo says there are delays in implementing the new Smart Card system that will allow riders to pay for bus passes and transit fares online.

OC Transpo General Manager Alain Mercier says the city will use Presto, which is the provincial Smart Card system.

Mercier says the delay is because of new features Ottawa will use with the system.
The cards have been in the works for a few years now, and implementation at the time was budgeted at $12M--no word on whether or not that bottom-line number has changed since 2008, when it was originally brought up. The cards are supposed to store either your monthly pass credit or a cash balance for fares, and will reportedly be implemented on the STO fleet, as well--but I've got no news on that front.

UPDATE: David Reevely picked up on this post over at Greater Ottawa, and it turns out smart cards for OC Transpo have been in the works for more than just a few years. The Ottawa Citizen first reported plans to implement them in 1997, with the timeline at that time being "within five years". Reevely raises a good question: Why can't we figure out how to do this?

Thursday, November 4, 2010

Interprovincial planning made a little easier

Yesterday, Gatineau's STO transit system launched a new trip planner called Plani-Bus (public transit utilities seem to have an unhealthy obsession with word-splices), a new system that was able to be combined with OC Transpo's trip planner to make cross-river public transit use a little more convenient for riders.

Just to try it out, I went to OCTranspo.com and asked for a trip plan from the Rideau Centre to the Casino du Lac Leamy, and it worked. At least I assume it worked, I didn't actually try the prescribed travel plan results.

Seems like a common-sense solution that is probably overdue, but will certainly be appreciated by interprovincial riders moving forward. Hopefully further integration of the two utilities--including timing complementary routes well at transfer points--will follow soon, too.

Tuesday, August 31, 2010

Interprovincial cycling strategy in the works, too

For a while now, the NCC and the cities of Ottawa and Gatineau, along with OC Transpo and STO, have been looking into ways to integrate public transit between the regions. Now, the cities and the NCC are also looking at finding ways to map out a 50-year plan to create a vision of cycling in the national capital region.

From the Ottawa Citizen:
NCC chief executive Marie Lemay, Ottawa Mayor Larry O’Brien and Gatineau Mayor Marc Bureau met Thursday to discuss a plan to improve cycling infrastructure over the next 50 years and to create a safer environment for the region’s cyclists.

“If we do want to increase the percentage of people using their bikes to commute, we have to make the routes safer,” Lemay said. “The reality is, if people don’t feel safe, and if it’s not easy to do, the people that are not avid cyclers … won’t take their bikes.”
It seems sensible to consider cycling when the region's municipalities work to integrate public transit. The two can often work with one another to provide transportation alternatives for residents, but serve more effectively as complements rather than mutually exclusive.

Wednesday, July 7, 2010

2010 Election: Taylor on interprovincial transit

Ottawa's Prince of Wales Bridge. © Padraic Ryan.

Over the course of the 2010 Mayoral Election campaign,
Public Transit in Ottawa will be sitting down with mayoral candidates, discussing their platforms and thoughts on transit in this city, and what they hope to achieve during their mandate, if elected mayor.

Another key part of Charlie Taylor's mayoral platform is an extension of the current O-Train across the Ottawa River into Gatineau, over the currently city-owned Prince of Wales bridge. It's an idea that has come up often (which is why the city owns the bridge), but seems to have been left on the back-burner for public transit in the city. Taylor thinks it needs to be brought back to the forefront.
An integrated rail network tying the whole city together, to me, is a no-brainer. They’re talking about building new bridges for cars across the river. There are, I think, something like 5,000 buses going across the river every day, and surely you could divert some of that traffic if you had a reasonable rail network in Gatineau linked to a reasonable rail network in Ottawa. They’ve already got the infrastructure in Gatineau, and we’re going to be connecting to the Bayview Station shortly—which is where the O-Train runs.
Taylor claimed that Ottawa actually owns land in Gatineau across the river to build a rail station for the O-Train to cross the river, but hasn't pushed the issue after, according to Taylor, encountering resistance from the Gatineau municipal government. Taylor says he would push ahead, whether Gatineau was in favour or not.
If Gatineau won’t talk to us, then I wouldn’t be averse to applying some pressure, saying, “You guys run a lot of STO buses to Ottawa; if you want to keep running your STO buses to Ottawa, let us run our train.” It’s just ridiculous. Tearing up rail line and putting in bus systems is what we were doing in the 1950s and everyone regrets it. The whole world is switching back to rail. We’re the only major city in Canada that doesn’t have a rail-based transit system. It’s more efficient, it’s cleaner, it’s a more comfortable way to go. It’s a no-brainer.
After extending the O-Train into Gatineau, Taylor also suggested the line should be extended southwards to the McDonald-Cartier Airport.

Recap of the interprovincial transit study consultation


On Tuesday evening, I stopped in to the public consultation on the National Capital Commission (NCC)-led interprovincial transit study. Attended by about 30-40 people (at least when I was there, from 6-7 p.m.), the consultation represents the fourth step in the overall process, the results of which will help the strategy team come up with a recommendation for integration of the national capital region's transit infrastructure--in short, better connecting Gatineau with Ottawa through public transit.

The consultation had a number of posterboards (images of which you can download in .PDF form here) and forms for attendees to fill out offering their opinions on the options presented. The options were largely broken down in short-, medium-, and long-term objectives, and dealt with the superficial (common branding and signage standards; shared transit maps) to the practical (compatible or common 'smart' payment cards; coordinated transfer-point route scheduling) and into the technical aspects of the transit integration (bus rapid-transit versus light-rail transit; crossing the river to the east or west of downtown, or a loop with both; and so on). And, naturally, there were forms for attendee comments about any other aspects--including those not presented on the posterboards.

Although an interesting exploration of the different options for interprovincial transit, it's unclear what this study will achieve, beyond the recommendation of an integration strategy. Although the cities of Ottawa and Gatineau are participants in the process, as are OC Transpo and STO (the city's respective public transit agencies), it remains to be seen who might pay for any such project. Ottawa's tied up with the current LRT implementation, which--from the first phase, including the downtown tunnel, to the further three phases--will take decades to build. Still, even if it is a recommendation, that does give the cities a foundation on which to plan future transit construction on either side of the river.

If you missed Tuesday's open house, you have still got the opportunity to attend one on Wednesday, July 7, 2010 at Gatineau Maison du Citoyen from 5:30-8 p.m.

Thursday, June 24, 2010

NCC looking for input on interprovincial transit in capital region

As a part of the National Capital Commission (NCC)-funded project looking into an interprovincial transit strategy for the National Capital Region to integrate Ottawa and Gatineau, a series of public consultations are scheduled to solicit the public's opinions on what form public transit should take between the two municipalities.

The press release is available here (.PDF), but the real important stuff is really just the dates for the two events:
  • Ottawa
    Tuesday, July 6, 5:30 to 8:30 p.m.
    Ottawa City Hall (110 Laurier Avenue West) – Jean Pigott Hall
  • Gatineau
    Wednesday, July 7, 5:30 to 8:30 p.m.
    Gatineau Maison du Citoyen (25 Laurier Street) – Agora Gilles-Rocheleau
The meetings are the fourth phase of the NCC project, which started in mid-2009 and is hoping to establish something new for Ottawa-Gatineau transit--by 2031, anyway. Some of the options that will be discussed at the consultations are increased bus service, surface light rail across the Prince of Wales, Chaudiere, and/or the Alexandria Bridge, and a tunnel through Ottawa--whether the DOTT, or a new one.

The preferred option, according to McCormick Rankin engineer Sean Rathwell as quoted in Metro Ottawa, is a light-rail loop across bridges to the west and east of downtown, with a tunnel under Ottawa. Similar, perhaps, to the illustration at the top of the page, taken from a May 2010 column by Randall Denley talking about 'the loop' (as it's become known).

The loop above appears to run across the Chaudiere and the Alexandria Bridges, but also runs west to include the War Memorial--it might make more sense to run the western leg along the Prince of Wales Bridge, in order to link up there, serve more of Gatineau, and also connect with the O-Train. But time will tell; if the NCC is taking the lead on this, the presence of federal support is virtually assured.

I hope to be at the Tuesday open house, and will post information I find on the site shortly afterwards.

Monday, May 17, 2010

Is there an appetite for streetcars back on Sparks Street?

There is a grassroots movement afoot to bring back the City of Ottawa's historic streetcars, more than 50 years after the city tore up and abandoned them. The Ottawa Streetcar Committee talked with some transit decision makers in Ottawa to try and find a way for streetcars to be re-installed along Sparks Street, from the National War Museum to the old train station by the canal. From the Centretown News Online:
The National Capital Commission, Queen’s Park, and the city sat down with the Ottawa Streetcar Committee which aims to draw people back to the beleaguered shopping district by bringing back historic street cars and to reduce bus congestion downtown.

The group estimates it will cost $16 million to get the project on track, a capital investment that David Powers, a city economic development consultant, said would require some integration with the city’s transit plans.
As interesting as the re-implementation of streetcars along Sparks Street would be, I don't know what kind of contribution they would offer to the city's rapid transit infrastructure. They could, if done well, beautify Sparks Street and offer some more options for public transportation downtown aside from Slater and Albert Streets. If done as proposed (somewhat along the lines of the illustration above), the line could perhaps be a very good complement during the construction of Ottawa's downtown tunnel, and a street-level alternative when the tunnel is open. But they wouldn't likely be able to serve a significant portion of the city's ridership.

Thursday, May 6, 2010

Building Ottawa and Gatineau together with light-rail transit

According to Randall Denley in a recent Ottawa Citizen column, the National Capital Commission is apparently interested in building and integrating 'The Loop' into Ottawa's forthcoming transit plan. 'The Loop' being a 2001 plan to have light-rail run from Bayview Station across the Ottawa River into Gatineau, along that city's downtown and back across the river, before running parallel to Wellington and back to Bayview Station. From the Citizen:
The federal policy that jobs and museums must be shared between Ottawa and Gatineau means the movement of a lot of people across the Ottawa River every day. More than 5,000 commuters come into the core of Ottawa from Gatineau during the morning rush hour and 2,000 go from Ottawa to Gatineau.
A plan which offer have immediate and significant improvements to the transit systems of both Ottawa, Gatineau, and therefore the National Capital region. According to estimates presented in the same column, the cost for The Loop was pegged at $110-200M; no small amount, but compared to the price tags attributed to other transit plans, and considering the upside the plan has, it would be nice to see something happen--and quickly.

Imagine spending a morning at the War Museum, hopping on a train that whisks you off to the Museum of Civilization for the afternoon, and then catch that train again to check out the National Gallery of Canada in the evening. Not a bad day.

Thursday, May 7, 2009

Integrating Ottawa and Gatineau transit: Looking for an intevprovincial strategy

Recently the National Capital Commission (NCC), City of Ottawa, and Société de transport de l’Outaouais (STO) launched a joint-sponsored website at Interprovincial-Transit-Strategy.ca. The website was launched by a group of consultants solicited by the three above-mentioned groups to assemble public input into the future of transit across the provincial line in the national capital region.

According to the website, the site was launched with ambitious goals:

The Strategy was launched as a proactive step to improve interprovincial coordination and efficiencies within the STO and OC Transpo transit services in the downtown cores of Gatineau and Ottawa.
There are a number of key issues to consider, not the least of which is the needs of commuters from either side to the other. It is anticipated to come to an end in January 2010, at which point the data gathered will be assembled into a recommendation for the best possible solution for inter-provincial integration.

There is significantly more information available on the above-linked official website, including more background information on the undertaking as well as copies of associated documentation.

For those interested, the first two consultations, planned as "Café-style small group discussions", are scheduled for the following dates:

Thursday May 14 2009
3:30 to 9:00 p.m.
Ottawa City Hall – Jean Pigott Hall
110 Laurier Avenue West, Ottawa

Tuesday May 19 2009
4:30 to 9:00 p.m.
Gatineau Maison du Citoyen – Agora
25 Laurier Street, Gatineau

Monday, March 30, 2009

STO expected to get extra transit funding from Quebec

The current rapid transit system in the works for Gatineau's Société de Transport de l’Outaouais (STO) has run roughly $38.5M ovre budget, but the Province of Quebec is expected to help cover the overage. The City of Gatineau and the federal government are also able to help out if need be. According to the Ottawa Citizen:

The Société de Transport de l’Outaouais revealed two weeks ago that between changes to the plans, inflation and rising construction costs, the originally projected $195-million Rapibus cross-city bus freeway would actually cost $233.5 million.

Quebec Transportation Minister Norman MacMillan is in discussions with STO to secure the extra Rapibus funding, said a department spokesman. MacMillan is also MNA for Papineau, a riding in the Outaouais.

“There shouldn’t be any problems with the additional amount,” said Stéphane Lauzon, adding he couldn’t confirm anything while they were still in talks.

It almost sounds like all three levels of government are clamouring to help the other city in the National Capital Region get their rapid bus transit system in place. Ottawa's got to figure out how to get that kind of arrangement... or at least get themselves organized to take advantage of public works money before it's dried up.

The Rapibus, which is essentially Gatineau's version of Ottawa's Transitway, was originally slated for completion in 2010 but has been delayed until 2011.

Tuesday, September 2, 2008

STO gets the boot from King Edward

In a move that is necessary, if possibly not a great way to encourage cooperation with the STO, Ottawa city council decided to give the Gatineau transit company one year to find alternate arrangements than their current use of King Edward Avenue to lay-up their buses. From an Ottawa Citizen article:

After years of inaction, city council voted yesterday to give Gatineau a year to come up with a plan to stop using King Edward Avenue and other Lowertown streets as a parking lot for their public buses.

Residents of Lowertown have lobbied the city for years to do something about Gatineau buses idling while clogging up busy streets. As the years have dragged on, the situation has gotten worse with more buses using the area, but little has been done.

The article went on to say that Somerset Councillor Diane Holmes was open to helping Gatineau come up with an alternate arrangement, which was a solid move in the interests of cooperation. Once the buses stop using King Edward, it should greatly improve traffic flow and maybe air quality in the area. It will definitely make the neighbourhood a little more pleasant for residents.

Wednesday, August 27, 2008

OC Transpo SmartCards on their way

According to a story in the Ottawa Citizen, OC Transpo is going to have a SmartCard transit payment system in place by 2011. The system will also be fully integrated with that of STO's buses, which is such a smart idea. From the story:
The cards would store either transit passes or a cash value, with card readers on buses and O-Train platforms. They would be replenished online, by telephone, by pre-arranged direct debit, or at current OC Transpo sales offices and vendors. Enforcement officers would have portable smartcard readers to ensure proof of payment.
What a great idea--even if it will cost $21M. Considering expenses on bus tickets and passes currently must be very high, the SmartCard system might actually be a cost-savings. It'll be a lot easier for bus drivers, too, I can imagine.

Sunday, August 3, 2008

The time is right for transit plan funding

It's as if there's a hilarious role-reversal going on in Ontario right now: the federal and provincial government is here, cheques in hand, and all they need are good ideas to spend it on. For the city of Ottawa, the pressure is on to get a funding request in good order if there is any hope of securing some of that money for public transit in Ottawa.

An article in the Toronto Star went over the interesting situation, and underlined the urgency cities need to think about with regards to infrastructure projects if they want to take advantage of this undoubtedly temporary generosity.

What's important, now, is to move as quickly as possible on getting shovels in the ground. With Ontario's economy battered by a high Canadian dollar, overheated fuel prices, a weakening U.S. economy and tough competition from countries such as China, the province needs an injection of job-creating construction projects.

[...]

Under the federal Building Canada Fund, Ottawa will spend $3 billion over seven years toward public transit, roads, bridges and other infrastructure in Ontario, with the province making a matching contribution.

An additional $3 billion is going to cities through a sharing of the federal tax on gasoline, also announced by Flaherty earlier. Also en route is $175 million in federal cash for special priorities such as waste-water infrastructure.

Obviously, rushing the planning and assessment processes at the expense of quality and thoroughness would be a mistake, but there is a definite urgency in the process right now. Contrary to what Mayor Larry O'Brien might think (or hope), this money is not going to be handed out based on demographics. It's going to be spent on projects that will have the most bang for their buck, and Ottawa is going to have to step it up if we want any significant amount of it.

The article from the Star ended with some words of wisdom with regards to infrastructure planning, which Ottawa's city council should heed if they are to approach transit planning with the right mindset:
It is the nature of big bureaucracies to move slowly. But economy-reviving construction projects and modern urban infrastructure are sorely needed now. Ideally, they should have been started years ago.

Naqvi, part seven: Bi-provincial partnerships

One of the most interesting obstacles that faces public transit in Ottawa is the proximity and, in many ways, inseparability between the actual city of Ottawa and the National Capital Region, which includes our neighbours across the river in Quebec. Any transit infrastructure that Ottawa and Ontario fund must necessarily incorporate the needs of commuters from Quebec, incorporating another set of municipal and provincial governments into the discussion.

Yasir Naqvi, as the member of provincial parliament for Ottawa Centre, is in a strong position to comment on the relationship between Ontario and Quebec. In an exclusive interview with TransitOttawa.ca, he expressed his faith that the two central Canadian provinces are willing and eager to work together on transit issues.

We have a good working relationship with the government of Quebec, and I think dialogue obviously fosters that. One of the things the two governments are looking at is the speed rail in the Quebec-Windsor corridor, I think something which a lot of people have been expecting for some time. Those conversations are taking place, the feasibility studies, so that's a step in the right direction.

Naqvi went on to describe the somewhat unique challenges Ottawa faces when making transit plans, and how to appease all levels of government--including the National Capital Commission (NCC)--when making the big decisions.

I think the challenge lies that we are, in the case of Ottawa, always have to be mindful that not only are we looking at three levels of government—you've got the federal government in terms of the NCC, the provincial government in terms of the financing element, and you've got the municipal government, the custodian, the operator of the transit system—but you've got the other level, which is dealing with the provincial government on the other side. But I think there is a lot of goodwill, I think there is a lot of recognition that something needs to be done keeping in mind the long-term vision of the growth of the region.

One of the main reasons for Ottawa's current transit plan, especially with regards to the downtown tunnel, is to get bus congestion off the roads so our downtown streets are more conducive to pedestrian and bicycle traffic. If, however, commuters from the other side of the river come in on Société de transport de l'Outaouais (STO) buses, then the objectives are not fully met. What it amounts to is yet another challenge facing transit planners: ensuring that OC Transpo buses aren't the only ones that our transit plans take into consideration.



_________________

Part seven of Yasir Naqvi on Public Transit in Ottawa, a TransitOttawa.ca exclusive:

Part One: Introduction
Part Two: Effective Public Transit
Part Three: Provincial Funding
Part Four: The Cancelled North-South Line
Part Five: Subway is "a good idea"
Part Six: Rail on the Ottawa River Parkway
Part Seven: Bi-Provincial Partnerships

Tuesday, May 13, 2008

Transit options continue to build: The Leadman Option

The Ottawa Sun reported another transit option from a City Councillor today, this one from Kitchississpi Councillor Christine Leadman, who feels that the current favoured option (number four) fails to address the most pressing issues in the city. The Leadman Option follows the Wilkinson Option, as brought forward a few weeks ago by Kanata North Councillor Marianne Wilkinson for much the same reasons as Leadman brought hers about.

From the Sun story, here are a few of Leadman's motivating factors:
"I'm all for the big picture but we need to do something now," she said.

Leadman is also giving a thumbs-up to Barrhaven Coun. Jan Harder's idea to use an existing VIA rail corridor that travels from Barrhaven to Tremblay Rd.

"These are things we can do now," she said. "We need to get people moving now. These are inexpensive and doable options."

[...]

One aspect of the latest plan that Leadman isn't happy with is that it gives too much attention to buses and not enough to creating a light-rail network that will serve the entire city.

"There are a lot more buses there than should be," said Leadman.

She likes the idea of a light-rail tunnel under the downtown but that will take years before the first passenger travels through it.

These are all valid concerns. A point I've made before, however, is that it's folly to quickly get people from the outskirts without making preparations to take care of them once they're in the core. The long-term plan perhaps shouldn't focus on buses, but they are a great complement in the short-term while the light-rail is established. Transfers are an issue, yes, and I like that councillors are actually looking at things that matter.

Leadman also brought up the very valid point that even if OC puts transit into a tunnel, a lot of people come from Quebec on buses. There isn't room for them in the tunnel, so what happens then?

Another piece of the transit puzzle she said the city isn't giving enough consideration is what to do with the more than 120 public transit buses that come across the Quebec border into Ottawa's downtown every day.

"We need to look at the Quebec side as well. We have to address that," she said. The Sun reported recently that Ottawa was looking at the possibility of a second tunnel to deal specifically with Gatineau buses at a cost of about $630 million.

Leadman joins councillors Clive Doucet and Marianne Wilkinson who are not pleased with the current transit option and have released their own transit plans.
I must have missed the Doucet Option, but he's got all sorts of info about it on his website. He's basically unpleased because the plan doesn't involve contact with new commuters because it's run along existing transit lines.

The bottom line is that it is necessary that council come up with the best plan for Ottawa. It's great that councillors are looking critically at the ideas, and dialogue on presented options is tremendous. Dialogue is different than each councillor making their own transit plan, though. I can see where it will go: each one will have light-rail going straight from their ward downtown. The hard part is taking the concerns of each councillor's ward, and balancing those with the concerns of the rest of the city. Each councillor is, after all, not only responsible to their ward, but also to the city as a whole.

Saturday, May 3, 2008

Funding Ottawa's transit plans, part five: Privatisation

The recent strikes of the Toronto Transit Commission has once again raised the idea of at least partial privatisation of the Torontonian transit system, according to the Globe and Mail. Would it be prudent for Ottawa to look into such a possibility? The story lays out the background, and runs over a few of the pros and cons:

Advocates say privatization will cut costs and improve services across the city. Detractors warn that it could lead to a mish-mash of companies servicing only the most popular routes, leading to poorer overall service, less central cohesion and no significant savings for the city.

“For thousands of Torontonians, the TTC is critical to their lives. They'll be very careful about changing the status quo,” Ward 34 councillor Denzil Minnan-Wong said. “Just selling the TTC outright to a private company and putting a ‘for sale' sign outside the doors of the TTC is unacceptable to the public, because it's so important to them.” So what is there to gain or lose by whittling down the TTC?

Despite regular commuter gripes about late service, the TTC is one of the most efficient transit systems in the world, in terms of operations, according to a TTC-commissioned study in 2003.

[...]

He [former Toronto budget chief David Soknacki] argues that it's vastly outdated: People no longer simply live in the suburbs and commute to the core. They need flexible service.

But outright privatization, he warns, could lead to private enterprise “cherry-picking” the most profitable services – and leaving the taxpayers to fund the rest. Instead, Mr. Soknacki suggests something in between: Split the TTC into specialty divisions and create one controlling body to oversee it and other Greater Toronto Area service providers.

“The administration has the choice of making fundamental changes to the TTC or watching those changes being made for it,” he said. “It's a shame, because the TTC could be leading [transit provision] instead of following.”


The story went on to talk about the city of London, England, where privatisation of public transit was done with mixed results:

London is held aloft by both camps as an example of the pros and cons of privatization. Those trumpeting the cons include TTC chair Adam Giambrone, who points to the failed privatization of London's iconic Underground as a cautionary tale. Contractors were paid to maintain and renew the Tube network while the government agency Transport for London (TfL) retained ownership of tracks, trains and stations.

But last year the five-corporation body called Metronet Rail BCV Ltd. that took on two of the three $34-billion contracts incurred debts of at least $4-billion, leaving TfL and the City of London to cover the loss. “There are no other major centres [outside London] that run privatized operations. There's a reason,” Mr. Giambrone said.

Above ground, however, London's bus reform is a glowing privatization success story, said Ben Dachis, a policy analyst for public-policy think tank the C.D. Howe Institute.

“The bus services in the U.K. after privatization are just off-the-charts better than they were before,” he said. “Prices are way down, service is way up. … The best way to get around London these days is on the bus. No one takes the Underground.”

I know Ottawa has tried some P3 (public/private partnership) experiments and, I'm no expert, but I don't think they've been either glowing successes or abysmal failures. The biggest problem for me would be ensuring some level of co-operation between various organizations, but the City of Ottawa already has to do so between OC Transpo and STO (Société de transport de l'Outaouais, the transit authority across the river).

Anyway, it's another option to think about.